InGen MillTek YinJiang

Equipment enquiries

Contact

Contact us using the form, by email at fred@jyyjjx.com or on WhatsApp. Share your material, tube profile, dimensions and production targets.

Tell us about your production needs

Start with your material, tube shape, dimensions and production goals. Equipment configuration can be discussed in detail later.

You can send an inquiry before choosing an equipment model. For a complete line, give the tube diameter range you need to produce, the thickness range and the material; for entry equipment, the material, strip width range, thickness range and line speed. You can also tell us whether you are planning a new line or changes to existing equipment.

The form below requires your name, email address and equipment requirements. Company, country or region, phone and equipment of interest are optional. The current form does not accept attachments; drawings and other supporting information can be sent by email or WhatsApp.

Contact us directly

fred@jyyjjx.com Tel. 0510-86222407 Chat on WhatsApp
WhatsApp QR code to chat with InGen sales
WhatsApp On a computer, scan with the WhatsApp camera on your phone.
Watch our videos on YouTube
JiangSu InGen MillTek Co., Ltd. No. 199 Changhe Street, Zhouzhuang Town, Jiangyin, Wuxi, Jiangsu, China

For technical documents or attachments, email us directly. Select the address to open your email app, or copy it into your preferred service.

Your requirements will be saved in our inquiry inbox and queued for a staff email notification.

We reply within 2–3 working days (longer during public holidays).

Name, email and requirements are required.

10 to 5,000 characters · 0/5,000

Questions buyers ask

How is the price determined?
By the tube specifications you need to produce and the equipment configuration; there is no list price. Send us your requirements and we will quote for your project.
What should I include in an enquiry?
For a complete line: the tube diameter range, thickness range and material. For entry equipment: material, strip width range, thickness range and line speed.
What is the typical delivery time?
Single machines from about 60 days, complete lines about 120 days, subject to contract.
How long a building does a complete line need?
It depends on the diameter range, production speed and line configuration, so we work it out with you for each project.
Can you send engineers for installation and commissioning abroad?
Yes. Our engineers guide installation and commissioning on site; costs are agreed per project.
Can you make stainless steel tube?
Yes. Stainless grades and sizes are assessed case by case; please mention them in your enquiry.
See all questions